VThere is also a new obligation. But, the company of Iber-Lepenc, via Ujman’s Hydrocentral Plant, has highly installed capacity, except for 35 megawatts for electricity production.
For the connoisseur, Adoring Hadzimus is far from satisfying consumption needs.
Kosovo cares about how I see the flow produced by Iber-Lepenci because of the generation potential.
That he won’t get a good look at it, another expert thinks.
The decision was made following the ban on electricity trading with Serbia.